Mountain View Corridor Project

Owner

Utah Department of Transportation Region 2

General Contractor

Staker Parson Companies/Ralph L. Wadsworth, a Joint Venture

Completion

November 2017

Location

West Valley City

Project Description

This project designed and constructed a new segment of Mountain View Corridor. It included a roadway and shared-use path through residential and commercial areas of West Valley City. The project added two miles of outside freeway lanes in both directions using both PCCP and HMA paving, 14 mainline bridges and seven pedestrian bridges, 200,000 SF of MSE walls and 750 LF of Box Culverts and extensive utility construction and coordination. A two mile shared use path was also built to add a safe space for walking, biking and other activities. Multiple access points were constructed to allow local users easy access to the path. The team also installed 35 decorative lamp posts according to city standards, as well as 110 trees as part of the project. The Mountain View Corridor Project won Utah Construction & Design’s Most Outstanding Highway Project over $10 Million in 2017.

  • 40,704 tons of HMA
  • 1,988 tons of SMA
  • 1,066 tons OGSC
  • 9,835 tons #4 Stone
  • 35,929 tons Free Draining granular Backfill
  • 473,119 tons Granular Embankment – Produced on site
  • 482,315 cubic yards of Excavation
  • 112,184 tons of UTBC – more than 102,300 ton was produced on site
  • 27,857 Ton of Granular Borrow – produced on site
  • 234,767 ton Select Wall back fill
  • PCCP Materials – 26,000 CY produced from portable batch plant
  • 14,799 ton of #57 Stone
  • 9,834 Ton of #4 Stone
  • 1,7664 Ton of Concrete sand washed
  • 5,983 Ton of pea gravel
  • 6,863 Ton Cement
  • 2,139 Ton Fly ash
  • 23,396 CY of Ready mix concrete
  • Storm Drain – Oldcastle Precast Supplied
  • 11,000 LF of 18” RCP
  • 3,800 LF of 24” RCP
  • 1,500 LF of 30” RCP
  • 430 LF of 36” RCP
  • 43 – 18” Flared End sections
  • 7 – 24” Flared End sections
  • 3 – 30” Flared End Section
  • 129 – 0-5’ catch basin
  • 25 – 5’-10’ catch basin
  • 9- 10’-15’ catch basin
  • 4 – 10-25 ‘ Catch Basin
  • 1 – 25’-30’ catch basin
  • 41 – man holes

    mountain view corridor


mountain view corridor


mountain view corridor


mountain view corridor


mountain view corridor


mountain view corridor


mountain view corridor


mountain view corridor

mountain view corridor


mountain view corridor


mountain view corridor


mountain view corridor


mountain view corridor


mountain view corridor


mountain view corridor


mountain view corridor


mountain view corridor


The post Mountain View Corridor appeared first on Staker Parson.


Viewing all articles
Browse latest Browse all 106

Trending Articles